NEW QUESTION 198
The function of selecting and sequencing available jobs to be run at individual work centers is known as:

  • A. Dispatching
  • B. Sequencing
  • C. Devolution
  • D. Decentralization

Answer: A

 

NEW QUESTION 199
Exponential smoothing gives the same results as a moving average but without the need to retain as much data and with easier calculations.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 200
A work center is to process 150 units of gear shaft SG 123 on work order 333.the setup time is 1.5 hours, and the run time is 0.2 hours per piece. What is the standard time needed or run the order?

  • A. 29.5 standard hours
  • B. 30 standard hours
  • C. 28 standard hours
  • D. 31.5 standard hours

Answer: D

 

NEW QUESTION 201
The line between two or more supply sources where the laid-down cost is the same is known as:

  • A. Inventory line
  • B. Market boundary
  • C. Cost line
  • D. Production boundary

Answer: B

 

NEW QUESTION 202
Control is exercised through individual items in a particular inventory, this is called:

  • A. Stock-keeping units
  • B. Stock entity
  • C. Inventory element
  • D. Inventory corps

Answer: A

 

NEW QUESTION 203
Which statement is best as it relates to PROTECTIVE CAPACITY?

  • A. the capabilities of the gateway workcenter
  • B. extra capacity used to protect against fluctuations in demand from the system constraint.
  • C. The capabilities of a system constraint
  • D. capacity that should always be utilized

Answer: B

 

NEW QUESTION 204
Changing the load may not de the preferred course of action. In short run, capacity can be adjusted. Some ways that this may be done are as follows EXCEPT?

  • A. Shift work force from under loaded to overloaded work centers
  • B. None of These
  • C. Schedule overtime or under time
  • D. Adjust the level of work force by hiring or laying off workers.

Answer: B

 

NEW QUESTION 205
What have most of the values clustered near a central point with progressively fewer results occurring away from the cluster?

  • A. Frequent distribution
  • B. Normal distribution
  • C. Average distribution
  • D. Relevant distribution

Answer: B

 

NEW QUESTION 206
The concept of removing faults at the first instance and making a process or product "fool proof" is known as:

  • A. None of the above
  • B. Poke-yoke
  • C. Statistical sole
  • D. Scrap step

Answer: B

 

NEW QUESTION 207
Planning bills are used to:

  • A. All of the above
  • B. Master production scheduling
  • C. Simplify forecasting
  • D. Material requirements planning

Answer: A

 

NEW QUESTION 208
1) What are the priorities-How much of what is to be produced and when?
2) What is available capacity-What resources do we have?
3) How can differences between priorities and capacity be resolved?
These questions must be answered:

  • A. At each level of MCP
  • B. During priority planning
  • C. During capacity planning
  • D. During material resource planning

Answer: A

 

NEW QUESTION 209
Stockout cost money for which of the following reason?

  • A. All of the above
  • B. Lost customers
  • C. Lost costs
  • D. Back-order costs

Answer: A

 

NEW QUESTION 210
Which of the following is NOT the role that warehouses serve?

  • A. Service
  • B. Transportation consolidation
  • C. Product mixing
  • D. Cubic space

Answer: D

 

NEW QUESTION 211
A good MRP system generates exception messages:

  • A. When there are problems that need the attention of the planner
  • B. When the manufacturing process is under control
  • C. Both A & C
  • D. To advise the planner when some event needs attention

Answer: C

 

NEW QUESTION 212
At the MRP planning level, the process of priority plans must be checked against available capacity is called

  • A. Production activity control (PAC)
  • B. Capacity Requirements planning (CRP)
  • C. Manufacturing Planning and control function (MPC)
  • D. Master Production schedule (MPS)

Answer: B

 

NEW QUESTION 213
Purchasing and production activity control:

  • A. is very short, perhaps from a day to month
  • B. Plans are reviewed and revised daily
  • C. All of these
  • D. the level of detail is high since it is concerned with individual components, workstations and ordered

Answer: C

 

NEW QUESTION 214
Which technique is based on the assumption that what happened in the past will happen in the future?

  • A. Quantitative Forecasting
  • B. Average demand Forecasting
  • C. Extrinsic Forecasting
  • D. Intrinsic Forecasting

Answer: D

 

NEW QUESTION 215
A difference between the physical count and inventory dollars for the inventory records is called:

  • A. Provocation
  • B. Resolution
  • C. Accuracy
  • D. Reconciliation

Answer: D

 

NEW QUESTION 216
What can be based on characteristics such as customer grouping, demand characteristics, or degree of customization?

  • A. Process focus
  • B. Functional focus
  • C. Product and market focus
  • D. Focused factory

Answer: C

 

NEW QUESTION 217
Government regulations majorly apply to areas as:

  • A. Product liability and safety
  • B. Environment and taxation
  • C. All of these
  • D. Population growth

Answer: A,B

 

NEW QUESTION 218
The costs those directly associated with the amount produced or sold are called:

  • A. Variable cost
  • B. Fixed cost
  • C. Total cost
  • D. Average cost

Answer: A

 

NEW QUESTION 219
......

Latest CPIM Study Guides 2021 - With Test Engine PDF: https://www.premiumvcedump.com/APICS/valid-CPIM-premium-vce-exam-dumps.html

Get New CPIM Practice Test Questions Answers : https://drive.google.com/open?id=1chhjVH4eHNx7-DToe8MWjwn4iTQBs7bU