
[Dec-2021] CPIM Exam Dumps - Free Demo & 365 Day Updates
Free Sales Ending Soon - Use Real CPIM PDF Questions
APICS CPIM Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
NEW QUESTION 160
If the units are discrete, such as automobiles, flow manufacturing is called:
- A. None of the above
- B. Repetitive manufacturing
- C. Fixed manufacturing
- D. Continuous manufacturing
Answer: B
NEW QUESTION 161
The bill of material shows
- A. None of the above
- B. The components that go into making the parent
- C. Both A & B
- D. The steps or process used to make the parent or the components
Answer: B
NEW QUESTION 162
_ is the delivered cost of a product to a particular geographic point.
- A. Delivery cost
- B. Laid-down cost
- C. Service cost
- D. Deteriorate cost
Answer: B
NEW QUESTION 163
Production planning includes;
- A. Forecasting
- B. All of these
- C. Material Requirement planning and capacity planning
- D. Master planning
Answer: B
NEW QUESTION 164
For back scheduling we need to know?
- A. Quantity and due date
- B. All of these
- C. Setup and run time for each operation
- D. Sequence of operations and Work centers needed
Answer: B
NEW QUESTION 165
Operation number
Setup hours, planned and actual
Quantity reported complete at the operation
Quantity reported scrapped at that operation
Due date or lead time remaining
These are the components of related to each operation.
- A. Shop-order detail file
- B. None of these
- C. Shop order master file
- D. Work-center master file
Answer: A
NEW QUESTION 166
A manufacturer has the alternative of making parts in-house or of buying them from an outside supplier. Reason/s to buy out may be:
- A. Allows the firm to concentrate on its own areas of specialization
- B. Uses specialized expertise of suppliers
- C. All of these
- D. Requires less capital investment
Answer: C
NEW QUESTION 167
Inventories are part of planning process and provide buffer against:
- A. Production rates
- B. None of these
- C. Differences in demand and production rates
- D. Demand rates
Answer: C
NEW QUESTION 168
Which one of the following is Not out of five basic inputs to the manufacturing planning and control system?
- A. Time needed to perform operations
- B. Product Description and process specifications
- C. Available facilities and quantities required
- D. Customized Design
Answer: D
NEW QUESTION 169
Over a 4-week period a work center produced 540 standard hours of work was available for 640 hours, and actually worked 480 hours. Calculate the utilization and the efficiency of the work center.
- A. 75%, 112.9%
- B. 75%, 110%
- C. 76%, 112.95%
- D. 75%, 110%
Answer: A
NEW QUESTION 170
When items required from stock must be selected from storage and brought to a marshalling area, this activity is called:
- A. Accept goods
- B. Pick goods
- C. Collect goods
- D. Select goods
Answer: B
NEW QUESTION 171
The major effect that just-in-time has on forecasting it's shortened,
- A. design time
- B. test time
- C. production time
- D. lead time
Answer: D
NEW QUESTION 172
Which of the following is NOT the method accounting use to cost inventory?
- A. Analysis cost
- B. Last in first out
- C. Average cost
- D. First in first out
Answer: A
NEW QUESTION 173
The specific way in which materials move depends upon which of the following factor?
- A. The channels of distribution that the firm is using
- B. All of the above
- C. The characteristics of the product
- D. The types of markets served
Answer: B
NEW QUESTION 174
Quality and delivery factor of products tend to have increased importance during:
- A. Decline phase
- B. Growth phase
- C. Introduction phase
- D. Maturity phase
Answer: B
NEW QUESTION 175
Which scheduling is concerned with production activity from the present to a few months ahead?
- A. Later production
- B. Early production
- C. Master production
- D. Small Production
Answer: C
NEW QUESTION 176
To check the feasibility of the master Production Planning, provide warnings to any bottlenecks; ensure utilization of work centers and advice vendors of capacity requirements is the purpose of:
- A. Work-capacity planning
- B. Realistic capacity planning
- C. Rough-cut capacity planning
- D. Expected capacity planning
Answer: C
NEW QUESTION 177
At the production planning level, where little detail is needed, this requires identifying product groups or families of individual product groups or families of individual products based on:
- A. None of these
- B. Difference in manufacturing processes of different product lines
- C. Similarity of manufacturing process
- D. Similarities of processes in manufacturing of same product line items
Answer: C
NEW QUESTION 178
The run time is equal to the run time per piece multiplied by the number of pieces in the order.
- A. False
- B. True
Answer: B
NEW QUESTION 179
The costs of correcting problems after goods or services have been delivered to the customer are called internal failure costs.
- A. False
- B. True
Answer: A
NEW QUESTION 180
The consolidation of several units into large units, called unit loads, so there is less handling, this is referred to as:
- A. Exclusiveness
- B. Itemization
- C. Unitization
- D. Solitary
Answer: C
NEW QUESTION 181
A distributor has decided to implement push replenishment throughout its network. Which action is most consistent with this decision?
- A. establishing a bill of distribution
- B. establishing safety stocks
- C. establishing lead times
- D. establishing double order points
Answer: A
NEW QUESTION 182
......
CPIM Dumps - Pass Your Certification Exam: https://www.premiumvcedump.com/APICS/valid-CPIM-premium-vce-exam-dumps.html
Latest Real APICS CPIM Exam Dumps Questions: https://drive.google.com/open?id=1chhjVH4eHNx7-DToe8MWjwn4iTQBs7bU