NEW QUESTION 31
When do you use variant bills of materials (BOMB)?

  • A. When multiple material also have the same BOM
  • B. When multiplematerial is have similar BOMB
  • C. When a material has a configurable BOM
  • D. When a material has multiple BOMB

Answer: A

 

NEW QUESTION 32
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. The work center has several individual capacities.
  • C. The Change Planning Direct on indicator is set.
  • D. Alternative resources are fully occupied.

Answer: A,B

 

NEW QUESTION 33
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 34
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a propagation range.
  • B. Use a planning group.
  • C. Use a heuristic.
  • D. Use a resource group.

Answer: C

 

NEW QUESTION 35
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for product-related alerts.
  • C. Create object selection variant for resource-related alerts
  • D. Create object selection variant for transportation lane-related alerts.
  • E. Assign the overall profile to the authorization profile.

Answer: A,B,C

 

NEW QUESTION 36
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Alphanumeric or quota arrangement
  • B. Lot size or material cost
  • C. Planned order or materialnumber
  • D. Validity period or sales order

Answer: A

 

NEW QUESTION 37
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Finiteness level (0...1)
  • C. Planning mode (bucket/sequence)
  • D. Direction (forward/backward)
  • E. Scheduling control (finite/infinite)

Answer: C,D,E

 

NEW QUESTION 38
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by ATP to determine the priority of alternative components.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by product costing to determine how costs are rolled up.

Answer: B,D

 

NEW QUESTION 39
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Reduction of associated capacity requirements

Answer: A,B,E

 

NEW QUESTION 40
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 41
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a separate resource inthe production data structure.
  • B. Model a resource inbound in the location master.
  • C. Model a transportation resource in the location master.
  • D. Model a handling resource in the location master and goods receipt time in the mater all master.

Answer: C,D

 

NEW QUESTION 42
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Operation network
  • C. Resource network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 43
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Production order release
  • B. Kanban
  • C. Back flushing
  • D. Material requirements planning

Answer: D

 

NEW QUESTION 44
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Picking list
  • B. Transfer Order
  • C. Kanban
  • D. Backflushing

Answer: A

 

NEW QUESTION 45
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, staging, release, material withdrawal, confirmation
  • B. Creation, scheduling, release, variance calculation, confirmation
  • C. Creation, scheduling, release, material withdrawal, confirmation
  • D. Creation, release, scheduling, material withdrawal, confirmation

Answer: C

 

NEW QUESTION 46
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with more than one work center
  • B. A production line with prioritized alternative work centers
  • C. A production line with an alternative sequence in the routing
  • D. A production line with a parallel sequence in the routing

Answer: A

 

NEW QUESTION 47
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Order-related
  • B. Milestone-related
  • C. Cost-related
  • D. Product-related

Answer: A,D

 

NEW QUESTION 48
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Past sales order quantities
  • E. Market intelligence

Answer: C,D,E

 

NEW QUESTION 49
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

Answer: C

 

NEW QUESTION 50
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Controller
  • C. MRP Group
  • D. MRP Profile

Answer: C

 

NEW QUESTION 51
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Move time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: A,D,E

 

NEW QUESTION 52
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 53
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Reduce the planning window.
  • C. Select an alternative mode on a resource.
  • D. Form optimum sequences to reduce setup times.
  • E. Execute a new production planning run.

Answer: A,C,D

 

NEW QUESTION 54
......