
Oct-2021 Oracle 1Z0-996-20 Actual Questions and Braindumps
1Z0-996-20 Dumps To Pass Oracle Exam in 24 Hours - PremiumVCEDump
NEW QUESTION 22
Using a base-supplied algorithm type, what is payment distribution priority typically determined by?
- A. Payment Type + Debt Age
- B. Service Agreement Type's Priority and Debt Age
- C. Customer Class and Debt Age
- D. Debt Age
- E. Customer Class and Service Agreement Type
Answer: C
NEW QUESTION 23
How do you ensure that specific Validation, Editing, and Estimation (VEE) rules are applied to estimated measurements?
- A. by adding the VEE Group to the Device Type
- B. by adding the VEE Group to the Device Configuration Type
- C. by adding the estimation rules to the Manual Override VEE Group to the Measuring Component Type
- D. by adding the VEE Group as the Fallback VEE Group for the appropriate VEE role
Answer: C
NEW QUESTION 24
For a customer to receive a Subscription communication, what must they have?
- A. an active account contact preference
- B. an active address contact preference
- C. an active person contact preference
- D. an active address type preference
Answer: A
NEW QUESTION 25
Which three statements are true about initial measurements, final measurements, and usage? (Choose three.)
- A. A service point can have more than one initial measurement for the same period, but only one final measurement.
- B. Usage is a synonym for bill determinants.
- C. Usage is loaded in the application to generate final measurements.
- D. The initial measurement data can be optionally stored in Raw format.
- E. Final measurements can be directly edited or updated by users or by automated processes as required.
Answer: A,C,E
NEW QUESTION 26
Which describes derived values and their relationship with Final Measurements?
- A. Final Measurements can have one derived value, which represents the Initial Measurement for the same Final Measurement Date/Time.
- B. Final Measurements can have multiple derived values, which represent other values for the same Final Measurement Date/Time.
- C. Final Measurements can have one derived value, which represents an alternative for the same Final Measurement Date/Time.
- D. Derived values can have multiple Final Measurements, which represent other values for the same Initial Measurement Date/Time.
Answer: A
NEW QUESTION 27
Which business object performs critical validations whenever initial measurements are loaded?
- A. D1-GenericIMDMain
- B. D1-IMDRetry
- C. D1-IMDPeriod
- D. D1-IMDSeeder
- E. D1-IMDPreVEE
Answer: D
NEW QUESTION 28
Throughout its lifecycle, an asset's disposition changes as it is moved between locations and service statuses.
Which are valid asset dispositions?
- A. In Receipt; Installed; In Stores; Retired
- B. In Receipt; In Field; In Stores; Retired
- C. Receiving; Installed; Storage; Retired
- D. Receiving; In Field; Storage; Retired
Answer: B
NEW QUESTION 29
On which three entities can proration be disabled? (Choose three.)
- A. Calculation Rule
- B. Rate Schedule
- C. Rate Version Calculation Group
- D. Bill Factor
- E. Calculation Rule Business Object
Answer: B,C,E
NEW QUESTION 30
What contains the details of how a bill was calculated and how it will be printed on a bill?
- A. Calculation Rules
- B. Rate Schedule
- C. Service Agreement
- D. Bill Segments
- E. Bill
Answer: D
NEW QUESTION 31
A device has one or more measuring components that measure consumption, demand, or other values.
Which lists two attributes of a measuring component?
- A. Serial Number and Badge Number
- B. Model and Serial Number
- C. Channel ID and Badge Number
- D. Manufacturer and Model
- E. Channel Multiplier and Channel ID
Answer: A
NEW QUESTION 32
New: An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer's initial roll-out strategy, the devices will have to be configured consistently to support existing tariffs for billing.
Which is a valid consideration to determine the setup of device type administrative data for this implementation?
- A. valid head-end systems, valid device configuration types, and the electricity service type
- B. the model number
- C. billing usage rules
- D. the device's date of manufacturer
Answer: D
NEW QUESTION 33
Your client has the following requirements:
Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
- A. Create two service points: one for subtractive import and the other for consumptive export.
- B. Create one new measuring component type for creating two measuring components (one for import and the other for export) that will be linked to one scalar device.
- C. Create one new measuring component type for creating a new measuring component that will be linked to two different scalar devices (one for import and the other for export).
- D. Create two new measuring component types (one for subtractive import and the other for consumptive export) to enable the creation of two measuring components that will be linked to one scalar device.
Answer: D
NEW QUESTION 34
Your client has three requirements:
1. Apply validations on meter reads coming from the Data Collectors.
2. If a meter read does not pass the validation, an error will be generated and assigned to a user.
3. Retry the validation every 30 minutes for the errors in case the issue is related to configuration.
Which statement describes the base functions you should use?
- A. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-COMP-TD (Complete To Do Entries).
- B. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)
- C. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)
- D. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.
- E. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.
Answer: C
NEW QUESTION 35
What correctly describes the possible causes of price proration?
- A. changes in Rate Schedule and Bill Factor only
- B. change in Bill Factor only
- C. change in Rate Schedule only
- D. changes in Rate Version Calculation Group and Bill Factor only
- E. change in Rate Version Calculation Group only
Answer: A
NEW QUESTION 36
A Service Order Orchestrator determines the steps required to complete the service.
As an example, based on the state of the service point, what does the Enable Service Orchestrator determine the actions for?
- A. Connect the Service Point; Install a Device; Turn on the Device
- B. Create a Device Configuration; Install a Device; Turn on the Device
- C. Create a Service Point; Install a Device; Turn on the Device
- D. Connect the Service Point; Install a Device; Create a Usage Subscription
Answer: C
NEW QUESTION 37
Which four statements correctly describe what a Service Agreement Type controls? (Choose four.)
- A. It controls the valid Rates that can be applied to the service agreement type.
- B. It controls where the bill is to be sent.
- C. It controls the Service Type to be billed.
- D. It controls debt age.
- E. It controls the Late Payment Charge Calculation Method.
Answer: A,C,D,E
NEW QUESTION 38
Which two statements about usage subscription types are correct? (Choose two.)
- A. Usage subscription types define the time zone.
- B. Usage subscription types define the main billing contact.
- C. Usage subscription types define the recipient of the usage.
- D. Usage subscription types define the valid service point types.
Answer: A,D
NEW QUESTION 39
......
Download the Latest 1Z0-996-20 Dump - 2021 1Z0-996-20 Exam Question Bank: https://www.premiumvcedump.com/Oracle/valid-1Z0-996-20-premium-vce-exam-dumps.html