Best Way To Study For Microsoft MB-335 Exam Brilliant MB-335 Exam Questions PDF [Q25-Q46]

Share

Best Way To Study For Microsoft MB-335 Exam Brilliant MB-335 Exam Questions PDF

Updated Verified Pass MB-335 Exam - Real Questions and Answers


The MB-335 certification exam is an excellent way for supply chain management professionals to demonstrate their expertise and advance their careers. By earning this certification, candidates can show that they have the knowledge and skills required to help clients optimize their supply chain processes and achieve their business goals using Microsoft Dynamics 365.


Microsoft MB-335 certification exam is designed for professionals who want to demonstrate their expertise in Microsoft Dynamics 365 Supply Chain Management. MB-335 exam is intended for functional consultants who work with clients to implement and configure supply chain management solutions using Microsoft Dynamics 365. MB-335 exam measures the knowledge and skills required to manage supply chain processes, including inventory management, procurement, sales, and distribution.


Microsoft MB-335 Exam is an essential stepping stone for anyone wishing to pursue a career as a Dynamics 365 Supply Chain Management Functional Consultant Expert. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification is highly valued in the market, and it demonstrates an individual's proficiency in the latest industry tools and practices. Preparing for MB-335 exam requires a significant investment of time and effort, but the benefits are well worth it, as it opens up new career opportunities and provides an excellent foundation for continued professional growth.

 

NEW QUESTION # 25
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 26
You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 27
You need to configure production operations for the pine and orange scent solutions.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Configure the BOM line to be of type Vendor and associate the corresponding vendor account.
  • B. Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.
  • C. Use a purchase agreement as a service agreement.
  • D. Configure a costing resource and requirement to point to a Vendor type resource.
  • E. Allocate subcontracted work in its own cost breakdown block.

Answer: A,D,E


NEW QUESTION # 28
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create cost groups.
2 - Associate cost groups to items and resources.
3 - Create overhead calculation node for materials as sucharge and labor as rate for setup time.
4 - Define the basis for calculation costs as absorption.


NEW QUESTION # 29
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Graphical user interface, text, application, table, email Description automatically generated


NEW QUESTION # 30
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Assign a Tracking dimension group with batch number as the only active tracking dimension.
  • B. Assign the item a Tracking dimension group with active serial number control
  • C. Assign it a Serial number group with per qty. defined as 1.
  • D. Create an inter-class unit of measure conversion between boxes and carats.

Answer: B,D

Explanation:
A catch weight item is an item that is sold by one unit of measure but is managed in inventory by a different unit of measure1. For example, diamonds are sold by boxes but weighed by carats. A full visibility catch weight item is a catch weight item that requires the weight of each individual container to be tracked2. For example, each box of diamonds must have its own weight recorded.
To set up a catch weight item for diamonds, you must do the following steps2:
Assign the item a Tracking dimension group with active serial number control. This enables the item to be tracked by serial numbers, which represent the individual containers of the item. Each serial number will have its own weight associated with it.
Assign the item a Serial number group with per qty. defined as 1. This ensures that each container of the item has a unique serial number and that only one container can be assigned to a serial number.
Create an inter-class unit of measure conversion between boxes and carats. This defines the relationship between the sales unit and the inventory unit of the item. The conversion factor can be based on a nominal weight or an average weight of the containers.


NEW QUESTION # 31
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
  • B. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • C. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
  • D. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

Answer: B,C

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/
Topic 3, Case Study 3 Adventure Works
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
The Street Kid YOLO models sell in different volumes depending on the market.
The creation of production orders for bicycles occurs monthly and is based on historical sales.
Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
The completed paper is used in the put-away process by the warehouse workers.
Financials
The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
A single pilot limited-edition bicycle is created as a proof of concept.
Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
Sales price must be auto calculated after the cost price is derived.
Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
All items except for the frame in the prototype process are considered finished items and can be sold individually.
The frame items require modifications in accordance with the manufacturing process as well as painting.
Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
AWIN must be able to sell only standard model bicycles.
AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
Warehouse workers must use the Warehouse Management mobile application to manage all inventory inbound and outbound from the warehouse.
Bicycle manufacturing
The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
Standard model bicycle production scheduling must be configured to start as soon as possible.
Bicycle components must be automatically reserved when the item is released to the production floor.
Standard model bicycle production must be automatically created on a predefined schedule.
As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
The system must log the immediate consumption of BOMs for traceability.
All inventory is warehouse enabled.
Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary.
The limited-edition bicycle will be designed for charity events and be produced for the summer season.
The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
A limited run of 100 bicycles must be created.
The limited-edition bicycles must use the same production process as the standard model bicycles.
The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
Frames must be painted in-house.
Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
When an order for the new limited-edition bicycle is created, payment must be provided.
An approval for an order must exist for the order to be processed.
Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 32
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Add an activity to the production route for deliveries.
  • B. Create a service product and set
  • C. Create a service product and set Stocked product - Yes.
  • D. Add an activity to the production flow for deliveries.

Answer: A,C


NEW QUESTION # 33
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. compensating
  • B. active
  • C. none
  • D. filler

Answer: B

Explanation:
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions


NEW QUESTION # 34
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source.
Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
To determine where production operations can be performed, you should recommend the following methods:
Record the start of production: You should recommend the Production floor execution interface method. This method allows workers to register their daily work, such as when they start a job, report feedback about jobs, register indirect activities, and report absence1. Workers can use the production floor execution interface to sign in with their badge IDs and select the jobs that they want to start from the All jobs tab1. They can also view the details and instructions for each job, and report good quantities and scrap1.
Report the number of production units completed and finished goods put away: You should recommend the Production floor execution interface and Warehouse Management mobile app methods. These methods allow workers to report the completion of production jobs and the movement of finished goods to inventory. Workers can use the production floor execution interface to complete a job by selecting it from the Active jobs tab and tapping Complete1. They can also print labels for the finished goods if required2. Workers can use the Warehouse Management mobile app to scan or enter license plates for the finished goods and put them away in a location3. They can also perform other warehouse operations, such as picking, packing, receiving, and cycle counting3.
Report time spent training a new employee about line operation: You should recommend the Production floor execution interface method. This method allows workers to register indirect activities that are not related to a specific production job, such as training, meetings, or maintenance1. Workers can use the production floor execution interface to register an indirect activity by tapping Indirect activity on the toolbar and selecting an activity type from the list1. They can also enter a quantity or duration for the activity, and add a comment if needed1.
1: How workers use the production floor execution interface 2: Print labels 3: Install and connect the Warehouse Management mobile app


NEW QUESTION # 35
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
A screen shot of a computer Description automatically generated


NEW QUESTION # 36
You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.

Answer:

Explanation:

NOTE: Each correct selection is worth one point.


NEW QUESTION # 37
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:


NEW QUESTION # 38
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 39
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Set all BOM lines warehouse to the production warehouse.
  • B. Set the operation route type as Vendor.
  • C. Set the operation route type as Standard.
  • D. Set the input warehouse on the resource to the vendor warehouse.
  • E. Set all the BOM lines to resource consumption.

Answer: A,B,D


NEW QUESTION # 40
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?

  • A. Increase
  • B. Postpone
  • C. Advance
  • D. Derived actions.
  • E. Decrease

Answer: E

Explanation:
The action message that you should enable is Decrease. Here is the explanation:
An action message is a system-generated suggestion to change an existing planned, approved, or firmed order. Action messages are generated by the master planning calculation in response to changed requirements1. For example, the ship date or quantity is changed on a sales order after you've already created a purchase order to fulfill the demand for that sales order. In this case, the master planning calculation generates one or more action messages that suggest that you update the purchase order. You decide whether to make the changes that are suggested.
The Decrease action message indicates that production orders, purchase orders, and other receipt transactions should be decreased to prevent excess inventory levels1. This action message is generated when there is less demand for a product than was previously planned. For example, if several sales orders are canceled, the master planning calculation will generate a Decrease action message for the corresponding planned production orders.
To enable the Decrease action message, you must select it on the Coverage groups page for the coverage group or item that you want the message to apply to1. You can also specify a decrease margin, which is the minimum percentage difference between the current quantity and the suggested quantity that will trigger a Decrease action message1.


NEW QUESTION # 41
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?

  • A. Run inventory close for the BOM items for the limited-edition bicycle.
  • B. Create the production order for the limited-edition bicycle and click estimate.
  • C. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
  • D. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

Answer: B


NEW QUESTION # 42
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 43
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/operation-scheduling-options


NEW QUESTION # 44
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Require an electronic signature when the formula is approved.
  • B. Select the Block removal of approval option for the formula
  • C. Select the Block editing option only.
  • D. Select Block editing and approve the formula.

Answer: B,D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions
Topic 2, CASE STUDY 1 Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:

Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
A). In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
B). The company is manually calculating an 8% overhead on materials and posting a journal manually.


NEW QUESTION # 45
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. compensating
  • B. active
  • C. none
  • D. filler

Answer: B

Explanation:
Explanation
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions